Engineering Details

02

Incinerator Engineering Details

Technical choices and specifications are assessed against your waste stream, capacity needs, site conditions and project requirements.

Industrial waste incinerator system in an engineered facility
1
2
3
Combustion process

Combustion follows the waste profile

1

Waste stream review

The specified waste stream and project requirements inform the combustion process and system configuration.

2

Process configuration

Combustion arrangements are selected for the waste profile and the requirements of the project.

3

System requirements

Capacity needs, site conditions and project scope guide the system configuration.

System components

Engineering choices follow the project scope

Flue-gas treatment, feeding and ash handling are considered during system engineering. Their arrangements depend on the waste profile, selected configuration and project requirements.

Flue-gas treatment

Treatment options are defined during project engineering to address the waste profile and applicable local requirements.


Feeding arrangement

Feeding arrangements are considered as part of the system configuration, based on the waste stream and project scope.


Ash handling

Ash-handling arrangements are developed as part of the configuration for the specified waste and project requirements.

Technical specifications

Compare model capacity and dimensions

01CXWSL-30 capacity and dimensions20-30 kg/batch
Feed opening: 400×520 mm
02CXWSL-50 capacity and dimensions30-50 kg/batch
Feed opening: 600×750 mm
03CXWSL-100 capacity and dimensions50-100 kg/batch
Feed opening: not stated
04CXWSL-150 capacity and dimensions100-150 kg/batch
Feed opening: not stated
05CXWSL-300 capacity and dimensions200-300 kg/batch
Feed opening: not stated
06CXWSL-500 capacity and dimensions400-500 kg/batch
Feed opening: not stated
Emissions and regulations

Confirm local requirements for each project

Emissions and regulatory requirements depend on the project location. Applicable requirements are confirmed during project review.

How are emissions requirements assessed?

Applicable emissions and regulatory requirements are confirmed for each project location. Flue-gas treatment options are defined during project engineering to address the waste profile and local requirements.

Can the system meet local regulations?

Requirements vary by location. Share the project location and applicable requirements so these can be considered in the system review.

What information helps assess compliance?

Provide the project location, waste profile and any applicable local requirements. These inform the review of treatment options and system configuration.

Are emissions test results available?

Applicable standards or test evidence can be reviewed when provided for publication. Requirements and evidence must be relevant to the project location.

Does flue-gas treatment vary by project?

Yes. Treatment options are defined during project engineering to address the waste profile and applicable local requirements.

Share your project details
Technical quotation request

Share your waste profile and project needs

Send the waste type, required capacity, project location and requirements for a system review and customized quotation.

Waste type and profile Required capacity and location Project scope and requirements
Include waste type, capacity, location and project requirements
滚动至顶部